International Airport Master Plan Update 2015 to 2035
Closing Report
Ready for the St. John’s International Airport Authority
January, 2017
Government Abstract of Airport Master Plan PDF
An replace to the Airport’s official Master Plan was commissioned in 2014 by the St. John’s International Airport Authority (SJIAA).
Improvement of the up to date Airport Master Plan was to contemplate the findings and suggestions produced from the a number of supporting research that had been accomplished for Airport Authority over the previous 10 years.
The replace, described herein, is a complete replace of the 2002 Airport Master Plan. Included, as a part of this Master Plan,
is an replace to the Airport’s 2001 Land Use Plan. St. John’s International Airport (SJIA) serves because the premier gateway to Newfoundland and Labrador and performs a major position in facilitating financial progress and improvement within the area.
Roughly 70 p.c of non-resident guests arrive within the province by way of the Airport in accordance to analysis cited by the SJIAA1 . SJIA additionally serves as a significant logistical and transport hub,
serving smaller communities in Newfoundland and Labrador, in addition to the off-shore oil and fuel trade.
The Airport covers roughly 639 hectares of land, which incorporates three (3) runways, related taxiways, aprons, a passenger terminal constructing,
and three (3) industrial improvement areas. In 2009 it was estimated that yearly the Airport generates in extra of $400 million in GDP to the Regional and Canadian economies, and contributes roughly 7,700 person-years of employment2 .
The first objective of the Airport Master Plan is to present the SJIAA with the framework to information the event of the Airport over a 20-year planning horizon and be sure that future enhancements are undertaken in a accountable method with due regard for operational effectivity,
security, monetary viability and the environmental compliance. SJIA is situated inside the Metropolis of St. John at its north finish, roughly 7 km from town centre.
To the north of the Airport is the group of Torbay. Entry to the west facet of the Airport and terminal space is from World Parkway, which in flip leads to Portugal Cove Street and from there to the Trans-Canada Freeway.
The amenities on the east facet of the Airport are accessed from Torbay Street. The Airport’s three runways embrace:
Runway 02-20, which measures 1,532.5 metres (5,028 toes) by 30.5 metres (100 toes), Runway 16-34, which measures 2,135.1 metres (7,005 toes) by 60 metres (197 toes), and Runway 11-29,
which measures 2,591.4 metres (8,502 toes) by 60 metres (197 toes). The Airport is able to supporting plane operations throughout instrument meteorological circumstances down to Class IIIA instrument precision minima.
In 2010 InterVISTAS Consulting Inc. ready long run air site visitors forecasts for St. John’s International Airport,
which included annual passenger volumes and plane actions at 5-year intervals from 2010 to 2020. In 2014 InterVISTAS undertook a assessment of those forecasts to assess their validity in opposition to current financial developments.
From 2010 to 2030 passenger exercise is predicted to improve by 81 p.c, from roughly 1.45 million passengers to nearly 2.5 million.
Essentially the most important areas of progress could be within the transborder and worldwide sectors. Throughout the identical interval, annual plane actions for Degree I-III air carriers are projected to improve from roughly 25,000 to 40,000.
Complete plane actions are presently estimated to be shut to 42,000 and are projected to improve to 56,000 by yr 2035.
To fulfill the long-term exercise calls for, this Airport Master Plan identifies a lot of potential infrastructure enhancements.
The Airport Master Plan will not be a dedication on the a part of the SJIAA to undertake any of those enhancements.
Quite, the enhancements recognized on this Master Plan could be triggered by particular exercise demand or adjustments in use, and topic to obtainable funding. Enhancements are usually not tied to an specific timeframe.
The proposed enhancements embrace:
Airside
- Extensions to each Runway 11-29 and Runway 16-34.
- Conversion of Runway 02-20 to a taxiway, to accommodate the enlargement of the East Business improvement space.
- Provision for a full parallel taxiway for Runway 11-29.
- Extension of Taxiway Kilo to assist expanded airside industrial improvement within the West Business Improvement Space
- Enlargement of apron areas to accommodate continued enlargement of the PTB and industrial areas.
- Enlargement of the Central Deicing Facility (CDF) to enhance capability and throughput.
- Enhanced airside safety measures for Tier 1 airports together with enhanced perimeter safety fence and detection measures,
together with a second NPSV facility and airside car hall to facilitate/join site visitors from Apron 2 coming into Apron 1 Important Restricted Space.
Passenger Terminal Constructing
- East enlargement of the PTB to accommodate expanded check-in and pre-board passenger screening amenities, in addition to an expanded baggage make-up space (presently underway).
- West enlargement of the PTB to accommodate expanded worldwide arrivals facility and expanded baggage declare space.
Groundside
- Enlargement of terminal parking capability.
- Enhancements to entry roads.
- Relocation of gas storage facility.
Business Improvement
- Provision to accommodate aviation and non-aviation associated industrial improvement with enlargement of the East and West Business Improvement Areas and with the closure of Runway 02-22, the creation of a brand new South Business Improvement Space.
A key element of the Airport Master Plan is an up to date Airport Land Use Plan. The aim of the Land Use Plan is to present a imaginative and prescient,
That permits for the rational improvement of the Airport to proceed whereas defending its long run operational and industrial viability.
The Land Use Plan for St. John’s International Airport is illustrated within the following Exhibit A3.